(01)
Overview
Beiyuan Track & Field Stadium
An eight-lane competition track at the Beiyuan stadium on Southwest University of Political Science & Law's Yubei campus, surfaced in JRace prefabricated track and certified by World Athletics at Class 1 — the higher of the two facility classes.
Built with
Prefabricated & SPUR · Prefabricated running track
Factory-rolled · fast install
(02)
At a glance
The details
What went in, and what it was built on. Every site differs — yours is settled at survey.
- Facility
- Beiyuan Track & Field Stadium, Yubei Campus, Southwest University of Political Science & Law
- Surface
- JRace Prefabricated Track — factory-made rubber rolls, bonded down on site
- Lanes
- Eight
- Certification
- World Athletics Class 1 Athletics Facility, construction category V
- Manufacturer
- Guangdong JRace New Material Co., Ltd
- Installed by
- Chongqing Yongchuang Sports Amusement Facilities Co., Ltd — 23 May 2025
- Marked by
- Langfang Renovation Sports Engineering Technology Co., Ltd — 24 May 2025
- Surveyed by
- Langfang Renovation Sports Engineering Technology Co., Ltd — 27–28 May 2025
- Tested in situ
- Guangzhou Labosport Co., Ltd — 6 June 2025
(03)
Certification
World Athletics Class 1 certified facility.
This certificate was issued for this facility, not for the product in general — the track was surveyed and measured on site before it was granted. It's linked in full below, so you can read it rather than take our word for it.
View the certificate(PDF)- Issuing body
- World Athletics
- Class
- Class 1 athletics facility
- Construction category
- V
- Certificate no.
- S-21-0321
- Issued
- 7 August 2025
- Valid to
- May 2030
- Notes
- No steeplechase event can be conducted.
(04)
The build-up
What's under the surface
This job was laid in Prefabricated running track. Every layer below went down in order, bottom to top — a finished surface is the whole build, not just the colour you can see.

Build-up
Cement/asphalt base · primer · binder layer · prefabricated rubber layer · marking line. The whole running surface arrives as one factory-made rubber layer, bonded down on site.
On site
The finished surface





