Prefabricated & SPUR series

Factory-made rolls and semi-prefabricated tracks — the poured-vs-rolled choice.

Two routes to a track (and a court): fully prefabricated rolled products, and SPUR — semi-prefabricated PUR that pairs a prefabricated cushion layer with a cast-in-place surface.

(01)

Overview

Prefabricated & SPUR

This family answers the “poured vs rolled” question. Fully prefabricated rolls give consistent factory performance and a fast install, while SPUR (semi-prefabricated PUR, a foamed polyurethane) combines a prefabricated cushion layer with a cast-in-place surface. SPUR is positioned to solve the three classic failure points of traditional prefabricated tracks — seam cracking, blistering and seam lift — and can be refurbished and recoloured by grinding and re-coating, a real advantage over standard prefab.

Factory-rolledRefurbishableFast install

(02)

The range

3 options within Prefabricated & SPUR.

Not sure which fits? Tell us the sport, the setting and roughly the size — the team will point you to the right one.

01

Prefabricated running track

A fully prefabricated rolled product — the surface is made under factory conditions and delivered in rolls, so its performance is settled before it reaches site and the install is quick. Offered in two variants: the “Teng” series for high elasticity and strong buffer performance, and the “Heng” series for longer life, using EPDM.

Choose it when
The programme is tight and you want factory-consistent performance rather than a surface cured on site.
Trade-off
Rolled means seams. If seams are the concern, SPUR below is the answer to that.
Cutaway of the prefabricated track build, from the bottom up: cement or asphalt base, primer, binder layer, prefabricated rubber layer, and marking line.

Build-up

Cement/asphalt base · primer · binder layer · prefabricated rubber layer · marking line. The whole running surface arrives as one factory-made rubber layer, bonded down on site.

02

SPUR running track

The semi-prefabricated product for athletics tracks: a prefabricated cushion layer with a cast-in-place surface over it, so you get factory-made cushioning under a seamless top. It's the grade positioned against prefab's three classic failure points — seam cracking, blistering and seam lift — and it can be refurbished and recoloured by grinding and re-coating.

Two series
C — the classic build. S — reinforced, adding toughening for better spike resistance, weather resistance and tensile strength.
Choose it when
You want prefab cushioning without prefab seams, or want the option to refurbish rather than replace later.
Cutaway of the SPUR track build, from the bottom up: cement or asphalt base, primer, binder layer, prefabricated rubber layer, buffer coat, PU top coat with EPDM granules, and marking line.

Build-up

Cement/asphalt base · primer · binder layer · prefabricated rubber layer · buffer coat · PU top coat with EPDM granules · marking line. The prefabricated cushion is the same idea as above, but here it sits under a poured top rather than being the surface itself — which is why there are no seams to run on.

03

SPUR Sport Court Flooring

The same semi-prefabricated SPUR build applied to courts rather than tracks — prefabricated cushion layer, cast-in-place surface — adapted for court sports.

Choose it when
A court wants SPUR's prefab cushion and seamless top rather than a fully poured SPU build.
What's different
The construction is SPUR; only the application changes from track to court.
Cutaway of the SPUR sport court build, from the bottom up: cement or asphalt base, primer, binder layer, prefabricated rubber layer, buffer coat, top coat and marking line.

Build-up

Cement/asphalt base · primer · binder layer · prefabricated rubber layer · buffer coat · top coat · marking line. Compare it with the SPUR track above: the same build, finished for court sports rather than running.

(03)

At a glance

The essentials

What we can tell you up front. Anything that depends on your site — base, groundworks, programme — is settled at survey.

We supply JRace products, which carry World Athletics certification. Whether a given install is certified depends on the base and build, which the team confirms per site.
About the standards

Best for
Tracks needing consistent factory performance, or a prefab/seamless hybrid
Standard
Confirmed per project
Finish
Rolled (Teng / Heng) or SPUR hybrid
Grades
Prefabricated running track · SPUR running track · SPUR Sport Court Flooring
Material
Prefabricated rubber rolls, or foamed polyurethane in the case of SPUR.
Build
Either factory-made rolls laid on site, or a prefabricated cushion layer under a cast-in-place surface.
Refurbishment
The SPUR surface can be ground back, re-coated and recoloured — a real advantage over standard prefab, which is generally replaced rather than refreshed.
Thickness
Confirmed per project with the manufacturer.
Base preparation
Whether groundworks and base preparation are included is confirmed per project — the survey sets out exactly what's needed.
Lead time
Confirmed per project. You'll have a realistic timeline in writing before anything is committed.
Warranty
Confirmed per project, in writing.

(04)

Proof

Built with Prefabricated & SPUR

Courts, tracks and surfaces we've supplied and installed using Prefabricated & SPUR.

See all projects

Next step

Let's get a survey and options together.

Tell us the sport, rough size and location and the JRace team will review it, recommend the right product and come back with indicative options — supply plus expert installation, arranged UK-wide. Or browse the work we've delivered.

ITF & World Athletics rangesCoventry · UK nationwidePriced per project

Talk to our team